M

Cadeler publishes Annual Report 2020, predicts robust growth

06 Apr 2021

Cadeler A/S, a key supplier within the offshore wind industry for installation services, operation and maintenance works, has today published the annual report for 2020. The annual revenue totaled EUR 20m and with an unprecedented EUR 310m order backlog, the company expects a 2021 revenue increase to EUR 56-63m.

On the back of strong strategic decisions leading to several new engagements, today, Cadeler A/S has announced publication of the annual report for 2020, revealing that the company has built capacity for future growth. The total revenue for 2020 was EUR 20m. This was impacted by upgrades to the fleet which lowered short-term operational capacity, but with the whole fleet again fully operational, Cadeler expects a significantly increased revenue for 2021 in the range of EUR 56-63m.

Mikkel Gleerup, CEO of Cadeler, said: “We are operating in a rapidly growing market and by virtue of our successful IPO and subsequent substantial fleet upgrades, Cadeler is poised to deliver strong growth in 2021. The past year was an unprecedented one in many ways, but our strategic vision and the outstanding efforts of our crew and staff ensures that we are ready to deliver our best-in-class offshore services at a much greater volume.”

In June 2020, Cadeler completed the installation of a new crane boom on the vessel Wind Osprey. The boom, with a 132-meter hook height above deck, was installed on schedule and at a lower cost than anticipated. With Wind Osprey again fully operational, Cadeler is even better placed to meet the demands of clients.

“We are set for a year with greater utilization of our fully operational fleet. We have contracted higher yielding projects that will lead to much greater profitability and revenue. However, we have only seen the beginning of Cadeler’s long-term growth trajectory fueled by a historically strong backlog over EUR 310m. I have never been more excited about Cadeler’s prospects,” comments Mikkel Gleerup.

 A year of great achievements, more to come

2020 was a transitional year for Cadeler with a complete rebranding and name change ahead of the IPO. The IPO raised NOK 883m to fund the announced new built best-in-class installation vessel, to serve the future offshore wind markets. Additionally, just before the end of 2020, the company announced the opening of an office in Vejle, to assure proximity to several important clients and a contract with NOV for the planned crane upgrades for the existing O-class vessels.

“As a company, we came into 2021 with a tailwind, and many of our strategic focus areas in 2020 will no doubt prove valuable in years to come. Today, we are backed by strong shareholders who share our belief that societies of tomorrow will be powered largely by renewable energy. As such, the market for our services is growing rapidly, and, with our upgrades to the current fleet and planned new-built X-class vessel, we are very well positioned to grow even further in the coming years”, Mikkel Gleerup commented.

Looking ahead, Cadeler believes that the demand for offshore wind energy and the need for best-in-class transportation and installation services will continue to grow. In a recent report, the Global Wind Energy Council outlines expectations for the levels of annual offshore wind turbine installations, pointing to a quadrupling by 2025, bringing the offshore market share of new global wind installations from 6.5% today to 21% in 2025.

KEY FIGURES: REVOLUTIONIZING OFFSHORE CONSTRUCTION

  • 310,000 EUR’000 backlog
  • 883,000 NOK’000 raised through IPO
  • 19,501 EUR’000 revenue in 2020
  • 30+ offshore sites served since 2012
  • 414 foundations installed since 2013
  • 287 wind turbines installed since 2014

- end - 

Annual Report 2020

For further information, please contact:

Mikkel Gleerup, CEO

+45 32463102

mikkel.gleerup@cadeler.com

06 Apr 2021

About the Company:

Cadeler provides marine and engineering operations to the offshore wind industry with a strong focus on safety and the environment. Our reputation as provider of high-quality offshore wind support services, combined with innovative vessel design, positions us to provide prime level services to the industry. We continue to pursue new levels of efficiency, pushing the boundaries of the supply chain. We enable and facilitate the global energy transition to a future built on offshore renewable energy.

News and Press releases

Cadeler announces signing of EUR 550 million Green Loan and Guarantee Facilities  08 Dec 2023
Cadeler secures capital to boost offshore wind transport and installation  15 Nov 2023
Cadeler announces Launch of Share Exchange Offer for all of the Outstanding Shares of Common Stock of Eneti  07 Nov 2023
Combination process of Cadeler and Eneti remains on track: Key filing submitted to SEC  19 Oct 2023
Interim Financial Report 2023: Cadeler presents positive results and an outlook exceeding expectations  29 Aug 2023
Cadeler enters Polish offshore wind market with the installation of 76 Vestas 15MW wind turbines  03 Jul 2023
Cadeler and Eneti announce agreement to combine and create a leading offshore wind turbine and foundation installation company  16 Jun 2023
Cadeler signs two contracts with Ørsted and enters a new strategic direction in the foundations space  25 Apr 2023
Cadeler is back on home ground and ready to install offshore wind turbines at the Aflandshage wind farm in Denmark  17 Apr 2023
Cadeler signs key contract with ScottishPower Renewables for East Anglia THREE  29 Mar 2023
Annual Report 2022: Cadeler continues to grow for the 2nd consecutive year while building strong order backlog and tripling fleet size  28 Mar 2023
Cadeler triples fleet after ordering second hybrid jack-up installation vessel  22 Nov 2022
Cadeler strengthens Senior Management team with three key profiles  17 Nov 2022
Letter of Intent signed with blue chip client  21 Oct 2022
Cadeler’s F-class vessel booked until 2030  12 Oct 2022
Interim Report 2022: Cadeler presents results for the first six months of 2022 and outlook for the full year in line with expectations  23 Aug 2022
Cadeler signs agreement with Ørsted for Hornsea Three offshore project  01 Aug 2022
Cadeler enters Polish offshore wind market after securing reservation agreement  18 Jul 2022
Cadeler signs its first agreements with ScottishPower Renewables for the East Anglia Hub project  13 Jul 2022
Cadeler signs firm contract with Siemens Gamesa to transport and install 60 offshore wind turbines off the coast of Scotland  23 Jun 2022
Cadeler A/S signs contract with Vestas to support the transportation and installation of 15 MW offshore turbines  07 Jun 2022
Cadeler signs 345 million USD contract with Cosco Heavy Industries to deliver a new jack-up foundation installation vessel  09 May 2022
Cadeler raises 86 million Euro to build a new foundation installation vessel  05 May 2022
Cadeler A/S is now ISO 45001 certified  28 Apr 2022
Cadeler A/S appoints new CFO as of 1 June 2022  31 Mar 2022
Annual Report 2021: Cadeler triples revenue, returns to profitability and builds strong order backlog  29 Mar 2022
Cadeler strengthens order backlog by securing important strategic contract with Vestas and an additional preferred supplier agreement with undisclosed client  27 Jan 2022
Cadeler chooses Dutch designed Leg Encircling Cranes for the two future X-class vessels  01 Dec 2021
Cadeler reflags: Fleet of advanced wind installation vessels will onwards be sailing under Danish flag  29 Nov 2021
Cadeler A/S signs firm contract with Ørsted for execution of joint German offshore wind projects  11 Nov 2021
Cadeler A/S secures preferred supplier agreement for undisclosed project  04 Nov 2021
Cadeler A/S signs key contract with Dutch contractor Van Oord to assist in executing Dutch offshore wind project “Hollandse Kust Noord”  11 Oct 2021
Cadeler A/S is chosen as preferred supplier by Ørsted for installation of German projects  07 Oct 2021
Interim report H1 2021: Cadeler delivers 253% growth in revenue and returns to profitability during first half of 2021  24 Aug 2021
Cadeler signs USD 651 million contract with COSCO SHIPPING Heavy Industry to deliver two new X-class vessels  30 Jun 2021
Cadeler A/S calls option for replacement of crane on Wind Osprey  17 Jun 2021
Cadeler A/S announces significant fleet expansion due to strong market demand  29 Apr 2021
Cadeler publishes Annual Report 2020  06 Apr 2021
Cadeler A/S announces largest contract in company history  10 Mar 2021
Cadeler A/S expands with new office in Vejle  22 Dec 2020
Cadeler A/S contracts new and improved crane to meet future offshore wind market demand  18 Dec 2020
Cadeler A/S to host online presentation in connection with its first day of listing on Oslo Børs  26 Nov 2020
IPO - Result of the Offering - New director appointed  26 Nov 2020
Update on status of bookbuilding and expiry of the bookbuilding/application period  24 Nov 2020
Update on Offer Price and Status of Bookbuilding  24 Nov 2020
Announcement of terms for the initial public offering  16 Nov 2020
Intention to Float  05 Nov 2020
Meet Cadeler's Board of Directors  05 Nov 2020
Swire Blue Ocean is becoming Cadeler  08 Oct 2020
Cadeler A/S signs contract with DEME for installation campaign on Hornsea 2  20 Oct 2020
Swire Blue Ocean intends to order new build vessel and invest in upgraded cranes for Pacific Orca and Pacific Osprey  16 Sep 2020
Pacific Osprey and Pacific Orca received their best eCMID inspection results since construction  20 Apr 2020
Swire Blue Ocean enacts precautions against COVID-19  26 Mar 2020
New workshop installed on Pacific Orca to facilitate onboard maintenance of nacelles  04 Mar 2020
Pacific Osprey’s new upgraded crane boom is on its way to Denmark for installation  24 Jan 2020
Vattenfall and Swire Blue Ocean sign final contract for transportation and installation of turbines in the Hollandse Kust Zuid wind farm  14 Jan 2020
WindEurope Offshore 2019 is over, see you soon!  16 Dec 2019
Meet us at WindEurope Offshore 2019  18 Nov 2019
SBO exhibits at Offshore Energy 2019 in Amsterdam  30 Oct 2019
SBO participates in the Danish Royal visit to France  28 Oct 2019
SBO Area Manager in Taiwan, Matt Bowden, speaks at the 7th Asia Offshore Wind Day.  24 Oct 2019
Pacific Orca passes by Copenhagen on her way to Wikinger Offshore Windfarm  24 Sep 2019
Let’s stay safe together  28 Sep 2019
SBO has started maintenance and service following recent agreement with Siemens Gamesa Renewable Energy  22 Jul 2019
Exhibiting at the Offshore Energy exhibition, Amsterdam  17 Oct 2018
SBO strengthens business presence in Taiwan with the appointment of new Area Manager, Matt Bowden  30 Apr 2019
Pacific Osprey chartered by GeoSea NV for transport of OTM  27 Mar 2019
SBO installing deepest fixed turbine  25 Feb 2019
Swire Blue Ocean employee killed in Great Belt train accident  11 Jan 2019
Halfway on Beatrice Offshore Wind Farm  21 Dec 2018
A milestone reached on Beatrice Offshore Wind Farm  31 Oct 2018
Press Update – 27th August 2018, 11:00 CET  27 Aug 2018
Press Update – 24th August 2018, 14:00 CET  24 Aug 2018
Beatrice project kicked off to a successful start  03 Jul 2018
Pacific Orca completes installation on the EOWDC  06 Jun 2018
Grand Opening Event  20 Apr 2018
New headquarters  15 Feb 2018
Appointment of Mikkel Gleerup as Chief Executive Officer  16 Jun 2021
Lars Blicher retires from Swire Blue Ocean A/S  16 Nov 2017
SBO moves to new and bigger facilities  30 Oct 2017
Gemini Offshore Wind Park Completion  01 Sep 2016
Swire Blue Ocean A/S signs contract with Siemens for Beatrice Offshore Windfarm Ltd (BOWL) project  02 Jun 2016
Congrats to Bilfinger with completing Sandbank foundation installation  12 Feb 2016
Milestone reached on Gemini. Congrats to Van Oord  31 Aug 2015
UK Rampion Offshore Wind Farm – we are proud to have been chosen for foundation installation  01 Jun 2015
Decommissioning now also of the Gas Booster Platform B11  23 Feb 2015
New key contract signed with Bilfinger for the Sandbank project  29 Sep 2014
New key contract signed with EPCI contractor Van Oord  19 Sep 2014
Pacific Osprey setting efficiency records with WTG installation on the DanTysk wind farm  30 Aug 2014
Pacific Orca safely completes foundation installation on the Borkum Riffgrund 1 wind farm  29 Jul 2014
First complete WTG installed on DanTysk  10 Apr 2014
BR1 Foundation Installation  27 Jan 2014
Swire Blue Ocean successfully completes H7 decommissioning job  22 Aug 2013
Swire Blue Ocean naming ceremony for Pacific Osprey at Fayard in Denmark  02 Apr 2013
Swire Pacific Offshore takes delivery of world's largest Windfarm Installation Vessel  30 Jul 2012
Second Windfarm Installation Vessel ordered for Swire Blue Ocean A/S  09 Mar 2011
Swire Pacific Offshore acquires Blue Ocean Ships A/S  09 Feb 2011
Swire Blue Ocean is awarded a contract for turbine installation on the DanTysk project  17 Feb 2011
First Windfarm Installation Vessel ordered for Swire Blue Ocean A/S  10 Aug 2010
Swire Blue Ocean clinches contract with MHI Vestas Offshore Wind for the transportation and installation of wind turbine generators at Seagreen offshore windfarm  16 Jun 2021
Pacific Osprey’s upgraded crane is now fully operational  03 Jun 2020